SR 9 over THUNDER CREEK

6.3 N JCT SR 20 · County 057, Washington · Built 1900 · 2 Lanes · 3,684 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0003349A0000000
Year Built
1900
Reconstructed
1947
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
3,684
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000
Total Project Cost
$383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.