HARRISON AVE. over DRY CREEK

1.0 N CENTRALIA · County 041, Washington · Built 1926 · 2 Lanes · 9,304 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
083380000000000
Year Built
1926
Reconstructed
1979
Length
21.6 m (70.9 ft)
Max Span
9.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,304
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$674,000
Total Project Cost
$1,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.