GALVIN RD. over CHEHALIS RIVER

1.5 W CENTRALIA · County 041, Washington · Built 1969 · 2 Lanes · 1,941 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
079847000000000
Year Built
1969
Length
121.9 m (399.9 ft)
Max Span
39 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,941
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,230,000
Total Project Cost
$6,460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.