PICKARD RD over DRY HOLLOW
0.1MI N SMITH SPRINGS RD · County 071, Washington · Built 1964 · 2 Lanes · 7 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.415208, -118.397603
This bridge is in worse condition than 79% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 62 years old.
Nearby Bridges
SMITH SPRINGS RD over DRY HOLLOW
Built 1926
SMITH SPRINGS RD over DRY HOLLOW
Built 1926
SMITH SPRINGS RD over DRY HOLLOW
Built 1932
LYONS FERRY RD over DRY HOLLOW
Built 1988
MCFEELY RD over WINNETT CANYON
Built 1951
WOODEN RD over WALKER CANYON
Built 2001
LYONS FERRY RD over WINNETT CANYON
Built 1988
SMITH SPRINGS RD over COLVILLE GULCH
Built 1922
SMITH SPRINGS RD over COLVILLE GULCH
Built 2004
PETTYJOHN RD over TOUCHET RIVER
Built 1914
Bridge Details
- Structure #
- 083121000000000
- Year Built
- 1964
- Reconstructed
- 1999
- Length
- 7.5 m (24.6 ft)
- Max Span
- 7 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 7
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $624,000
- Total Project Cost
- $1,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.