LYONS FERRY RD over DRY HOLLOW

7.267 N SR 124 · County 071, Washington · Built 1988 · 2 Lanes · 335 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
080234000000000
Year Built
1988
Length
13.7 m (44.9 ft)
Max Span
13.4 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
335
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$993,000
Total Project Cost
$1,986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.