JACKSON HWY SOUTH over SALMON CREEK
1.0 S. S.R. 505 · County 041, Washington · Built 1923 · 2 Lanes · 1,368 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.423186, -122.840261
This bridge is in worse condition than 50.7% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 103 years old.
Nearby Bridges
SR 505 over COWLITZ RIVER
Built 1994
TOOLEY ROAD over SALMON CREEK
Built 1977
COLLINS ROAD over DRAINAGE DITCH
Built 1962
WALKER ROAD over BRANCH FOSTER CREEK
Built 1957
TOLEDO SALMON ROAD over LITTLE SALMON CREEK
Built 1955
TOLEDO SALMON CRK over SALMON CREEK
Built 1977
I-5 over COWLITZ RIVER
Built 1953
I-5 over COWLITZ RIVER
Built 1953
SR 506 over I-5
Built 1958
I-5 over LACAMAS CR DREWS PR RD
Built 1953
Bridge Details
- Structure #
- 082674000000000
- Year Built
- 1923
- Reconstructed
- 1981
- Length
- 66.1 m (216.9 ft)
- Max Span
- 18.3 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,368
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,856,000
- Total Project Cost
- $3,711,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.