I-5 over COWLITZ RIVER

2.0 N COWLITZ CO · County 041, Washington · Built 1953 · 2 Lanes · 21,828 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0004367A0000000
Year Built
1953
Length
231.6 m (759.8 ft)
Max Span
73.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
21,828
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,678,000
Total Project Cost
$13,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.