FIRST ST (PAC BCH) over B N R R (NO TRACKS
0.3 SW JCT SR 109 · County 027, Washington · Built 1975 · 2 Lanes · 1,470 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.209494, -124.203783
This bridge is in worse condition than 79.8% of bridges in County 027. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
SR 109 over JOE CR
Built 1953
OCEAN BEACH ROAD over JOE CREEK
Built 2000
SR 109 over MOCLIPS RIVER
Built 1955
SECOND ST (MOCLIPS over MOCLIPS RIVER
Built 1965
IRR BIA RTE 2 over MOCLIPS RIVER
Built 1965
IRR BIA RTE 26 over NORTH FORK MOCLIPS RIVER
Built 1976
IRR BIA RTE 2 over NORTH FORK MOCLIPS RIVER
Built 1984
SR 109 over UNT TO BOONE CREEK
Built 2024
SR 109 over WRECK CREEK
Built 1957
OCEAN BEACH ROAD over COPALIS RIVER
Built 1972
Bridge Details
- Structure #
- 082636000000000
- Year Built
- 1975
- Length
- 30.5 m (100.1 ft)
- Max Span
- 9.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,470
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,988,000
- Total Project Cost
- $3,975,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.