SECOND ST (MOCLIPS over MOCLIPS RIVER

00.1 W JCT SR 109 · County 027, Washington · Built 1965 · 2 Lanes · 636 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
080715000000000
Year Built
1965
Length
51.2 m (168 ft)
Max Span
8.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
636
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,213,000
Total Project Cost
$6,426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.