UNION FLAT/9020 over UNION FLAT CREEK

4.63 MI SE WAWAWAI-PULLMN · County 075, Washington · Built 1963 · 2 Lanes · 34 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
082557000000000
Year Built
1963
Length
29.6 m (97.1 ft)
Max Span
29 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
34
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,932,000
Total Project Cost
$3,863,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.