WAWAWAI-PULMN/9010 over UNION FLAT CREEK
5.19 MI S SR 194 · County 075, Washington · Built 1971 · 2 Lanes · 335 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.638992, -117.268872
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
UNION FLAT/9020 over UNION FLAT CREEK
Built 1995
LITTLE/9170 over UNION FLAT CREEK
Built 1980
HATLEY/9550 over UNION FLAT CREEK
Built 1963
COUNTRY CLUB/9040 over BRANCH UNION FLAT CREEK
Built 2011
KLEMGARD/9480 over UNION FLAT CREEK
Built 1973
CHAMBERS/9620 over DRAINAGE CHANNEL
Built 1958
UNION FLAT/9020 over UNION FLAT CREEK
Built 1963
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1972
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1972
STALEY/9030 over STALEY CREEK
Built 1971
Bridge Details
- Structure #
- 080027000000000
- Year Built
- 1971
- Length
- 36.6 m (120.1 ft)
- Max Span
- 36 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 335
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,346,000
- Total Project Cost
- $4,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.