SCHMIT ROAD over CEDAR CREEK
6.0 E TOLEDO · County 041, Washington · Built 1953 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.419228, -122.726042
This bridge is in worse condition than 50.7% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 73 years old.
Nearby Bridges
SR 505 over CEDAR CREEK
Built 1962
SR 505 over SALMON CREEK
Built 1951
CEDAR CREEK ROAD over CEDAR CREEK
Built 1977
TOLEDO SALMON CRK over SALMON CREEK
Built 1977
TOLEDO SALMON ROAD over LITTLE SALMON CREEK
Built 1955
HOWE ROAD over SKOOK CREEK
Built 2003
TOOLEY ROAD over SALMON CREEK
Built 1977
COLLINS ROAD over DRAINAGE DITCH
Built 1962
SPENCER ROAD over BLUE CREEK
Built 1958
JACKSON HWY SOUTH over SALMON CREEK
Built 1923
Bridge Details
- Structure #
- 082523000000000
- Year Built
- 1953
- Length
- 19.8 m (65 ft)
- Max Span
- 9.1 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $324,000
- Total Project Cost
- $648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.