GLENWOOD/2450 over DRY CREEK
0.04 MI S DRY CREEK · County 075, Washington · Built 1967 · 2 Lanes · 90 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.964903, -117.288336
This bridge is in worse condition than 79.7% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
SUESS/2465 over DRY CREEK
Built 1965
ELBERTON/2400 over DRY CREEK
Built 1974
US 195 over DRY CREEK
Built 1954
GLENWOOD/2450 over PALOUSE RIVER
Built 1967
ELBERTON/2400 over NORTH FORK PALOUSE RIVER
Built 1987
DANAHER/4450 over DRY CREEK
Built 1977
BIXLER/4460 over DRY CREEK
Built 1977
ELBERTON/2400 over NORTH FORK PALOUSE RIVER
Built 1969
ORAL SMITH/2590 over NORTH FORK PALOUSE RIVER
Built 1975
ORAL SMITH/2590 over NORTH FORK PALOUSE RIVER
Built 1975
Bridge Details
- Structure #
- 082240000000000
- Year Built
- 1967
- Length
- 10.4 m (34.1 ft)
- Max Span
- 9.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $794,000
- Total Project Cost
- $1,588,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.