ORAL SMITH/2590 over NORTH FORK PALOUSE RIVER
0.01 MI NE DRAPER-BROWN · County 075, Washington · Built 1975 · 2 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.98035, -117.218275
This bridge is in worse condition than 16.6% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
ORAL SMITH/2590 over NORTH FORK PALOUSE RIVER
Built 1975
ELBERTON/2400 over NORTH FORK PALOUSE RIVER
Built 1969
ELBERTON/2400 over NORTH FORK PALOUSE RIVER
Built 1987
ELBERTON/2400 over SILVER CREEK
Built 1975
LANGE/2410 over PALOUSE RIVER
Built 1997
ELBERTON/2400 over DRY CREEK
Built 1974
GLENWOOD/2450 over DRY CREEK
Built 1967
SUESS/2465 over DRY CREEK
Built 1965
3RD STREET over SILVER CREEK
Built 1980
ALTERGOTT/2420 over PALOUSE RIVER
Built 1990
Bridge Details
- Structure #
- 081178000000000
- Year Built
- 1975
- Length
- 31.7 m (104 ft)
- Max Span
- 31.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,058,000
- Total Project Cost
- $4,115,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.