WHITMAN RD over N.F. STILLAGUAMISH RIVER

0.1 N JCT SR 530 · County 061, Washington · Built 1980 · 2 Lanes · 149 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
081038000000000
Year Built
1980
Length
70.1 m (230 ft)
Max Span
30.5 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
149
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,332,000
Total Project Cost
$8,664,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.