SR 530 over DEER CREEK

11.6 E JCT SR 9 · County 061, Washington · Built 1972 · 2 Lanes · 4,618 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009119A0000000
Year Built
1972
Length
64 m (210 ft)
Max Span
31.4 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,618
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,895,000
Total Project Cost
$3,790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.