O RD NW over WEST CANAL
O NW 0.6 North of SR 28 · County 025, Washington · Built 1949 · 2 Lanes · 313 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.243139, -119.810647
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 77 years old.
Nearby Bridges
MAINTENANCE ROAD over DW231 WASTEWAY
Built 2015
N RD NW over IRRIGATION LATERAL
Built 1952
SR 28 over WEST CANAL
Built 1950
Farm Access over West Canal W26C lateral
Built 2000
MAINTENANCE ROAD over WEST CANAL
Built 1951
MARTIN ROAD over WASTEWAY
Built 1952
Farm Access over West Canal W26C Lateral
Built 1987
P NW over LAT. BLK 73
Built 1996
P NW over CANAL W26A BLK 73
Built 1993
Farm Access over West Canal W26C Lateral
Built 2007
Bridge Details
- Structure #
- 080899000000000
- Year Built
- 1949
- Length
- 32 m (105 ft)
- Max Span
- 8.8 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 313
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,076,000
- Total Project Cost
- $4,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.