SR 28 over WEST CANAL
0.9 E JCT SR 281 · County 025, Washington · Built 1950 · 2 Lanes · 8,758 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.233947, -119.834758
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 76 years old.
Nearby Bridges
SR 281 over WEST CANAL
Built 1950
O RD NW over WEST CANAL
Built 1949
Q - NW over IRRIGATION CANAL
Built 2003
MAINTENANCE ROAD over DW231 WASTEWAY
Built 2015
P NW over LAT. BLK 73
Built 1996
P NW over CANAL W26A BLK 73
Built 1993
Farm Access over West Canal W26C lateral
Built 2000
R RD NW over LAT. BLK 73
Built 1995
11 ROAD NW over LAT. BLK 73
Built 1952
MAINTENANCE ROAD over WEST CANAL
Built 1951
Bridge Details
- Structure #
- 000000LV0000000
- Year Built
- 1950
- Reconstructed
- 1988
- Length
- 35.1 m (115.2 ft)
- Max Span
- 12.5 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 2
- Daily Traffic
- 8,758
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,120,000
- Total Project Cost
- $2,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.