8TH STREET NE over GREEN RIVER

0.4 MI E OF HARVEY RD · County 033, Washington · Built 1973 · 3 Lanes · 21,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

47.315525, -122.205894

This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
080797000000000
Year Built
1973
Length
41.9 m (137.5 ft)
Max Span
41.9 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
21,100
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,503,000
Total Project Cost
$7,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.