SR 18 over BNSF RR SPUR

0.8 E JCT SR 164 · County 033, Washington · Built 1986 · 2 Lanes · 31,748 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

47.303542, -122.208489

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 40 years old.

Nearby Bridges

Bridge Details

Structure #
0012618A0000000
Year Built
1986
Length
64.6 m (211.9 ft)
Max Span
25.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
31,748
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,216,000
Total Project Cost
$4,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.