FARMINGTON/1000 over PINE CREEK
0.03 MI W FRMNGTN CTY LMT · County 075, Washington · Built 1915 · 2 Lanes · 364 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.089586, -117.052386
This bridge is in worse condition than 79.7% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 111 years old.
Nearby Bridges
GARFLD-FRMGTN/1300 over SOUTH FORK PINE CREEK
Built 1973
FIRST STREET over SOUTH FORK PINE CREEK
Built 1918
REUBEN SCHLTZ/1370 over PINE CREEK
Built 1965
WHITE/1075 over WILLOW CREEK
Built 1998
FARMINGTON/1000 over PINE CREEK
Built 1969
FARMINGTON/1000 over PINE CREEK
Built 1980
AUVIL-WAGNER/1200 over PINE CREEK
Built 1972
RYDE RD. 1450 over UNNAMED DRAINAGE
Built 2007
GARFLD-FRMGTN/1300 over SILVER CREEK
Built 1974
GARFLD-FRMGTN/1300 over SILVER CREEK
Built 1974
Bridge Details
- Structure #
- 080509000000000
- Year Built
- 1915
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 364
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.