REUBEN SCHLTZ/1370 over PINE CREEK
2.44 MI SE AUVIL-WAGNER · County 075, Washington · Built 1965 · 2 Lanes · 23 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.086767, -117.085869
This bridge is in worse condition than 54.4% of bridges in County 075. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
FARMINGTON/1000 over PINE CREEK
Built 1969
FARMINGTON/1000 over PINE CREEK
Built 1915
GARFLD-FRMGTN/1300 over SOUTH FORK PINE CREEK
Built 1973
FIRST STREET over SOUTH FORK PINE CREEK
Built 1918
FARMINGTON/1000 over PINE CREEK
Built 1980
AUVIL-WAGNER/1200 over PINE CREEK
Built 1972
WHITE/1075 over WILLOW CREEK
Built 1998
SIMMONS/1590 over BRANCH SILVER CREEK
Built 1921
AUVIL/1240 over PINE CREEK
Built 1976
BLACK / 2300 over KELLY CREEK
Built 2021
Bridge Details
- Structure #
- 079726000000000
- Year Built
- 1965
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.3 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 23
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $993,000
- Total Project Cost
- $1,986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.