TULE RD. over IRRIGATION CANAL
00.48 W PLANK ROAD · County 077, Washington · Built 1957 · 2 Lanes · 36 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.294403, -120.230142
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 69 years old.
Nearby Bridges
PLANK RD. over SATUS CREEK
Built 1956
SR 22 over TOPPENISH CREEK
Built 1976
TULE RD. over DRY WASH
Built 1962
SR 22 over MARION DRAIN CANAL
Built 1956
TULE RD. over DRY WASH
Built 1970
INDIAN CHURCH-IRRI over TOPPENISH CREEK
Built 1964
SLAYTON RD. over MARION DRAIN
Built 1960
INDIAN CHURCH IRR over MARION DRAIN
Built 1965
INDIAN CHURCH RD. over SLOUGH
Built 1954
HARRIS RD. N. over DRAIN
Built 1959
Bridge Details
- Structure #
- 080428000000000
- Year Built
- 1957
- Length
- 23.8 m (78.1 ft)
- Max Span
- 9.4 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 36
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $593,000
- Total Project Cost
- $1,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.