SR 22 over TOPPENISH CREEK

1.7 E JCT SR 223 · County 077, Washington · Built 1976 · 2 Lanes · 1,704 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0010039A0000000
Year Built
1976
Length
35.7 m (117.1 ft)
Max Span
13 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
1,704
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,112,000
Total Project Cost
$2,223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.