SOUTH BANK ROAD over CHEHALIS R OVERFLOW

0.6 S JCT SR 12 · County 027, Washington · Built 1965 · 2 Lanes · 1,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
079941000000000
Year Built
1965
Reconstructed
1977
Length
103 m (337.9 ft)
Max Span
8.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,250
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$6,278,000
Total Project Cost
$12,556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.