SOUTH BANK ROAD over CHEHALIS R OVERFLOW

1.0 S JCT SR 12 · County 027, Washington · Built 1965 · 2 Lanes · 2,917 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
079940000000000
Year Built
1965
Reconstructed
1977
Length
24.8 m (81.4 ft)
Max Span
9.4 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
2,917
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,652,000
Total Project Cost
$3,303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.