6 RD NE over ROCKY COULEE

6 NE 0.1 W of W NE · County 025, Washington · Built 1914 · 2 Lanes · 71 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
079888000000000
Year Built
1914
Length
15.8 m (51.8 ft)
Max Span
14 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
71
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$25,000,000
Total Project Cost
$100,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.