ROAD over GREENWATER RIVER

0.1 MI N OF 70/7010 JCT · County 033, Washington · Built 1979 · 1 Lanes · 48 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
060507000001305
Year Built
1979
Length
41.7 m (136.8 ft)
Max Span
41.1 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
48
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.