SR 410 over GREENWATER RIVER

17.9 E JCT SR 164 · County 033, Washington · Built 1932 · 2 Lanes · 1,907 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0001599D0000000
Year Built
1932
Length
28.3 m (92.8 ft)
Max Span
13.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,907
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$662,000
Total Project Cost
$1,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.