SR 16 over PURDY CREEK

1.8 N JCT SR 302 · County 053, Washington · Built 2023 · 2 Lanes · 26,993 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.397414, -122.621222

This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
0019763A0000000
Year Built
2023
Length
62.8 m (206 ft)
Max Span
60.4 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
26,993
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,957,000
Total Project Cost
$3,914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.