NB SR 16 over BURLEY-OLLALA RD

2.0 N PIERCE CO · County 035, Washington · Built 2009 · 2 Lanes · 27,161 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.432222, -122.623056

This bridge is in worse condition than 10% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 17 years old.

Nearby Bridges

Bridge Details

Structure #
0017550A0000000
Year Built
2009
Length
23.2 m (76.1 ft)
Max Span
22.6 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
27,161
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$758,000
Total Project Cost
$1,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.