US 101 over UNNAMED TRIBUTARY

15.3 N JCT SR 109 · County 027, Washington · Built 2023 · 2 Lanes · 2,503 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0019567A0000000
Year Built
2023
Length
8 m (26.2 ft)
Max Span
8 m
Width
23.9 m (78.4 ft)
Lanes
2
Daily Traffic
2,503
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.