US 101 over WEST FORK HOQUIAM RIVER

11.6 N JCT SR 109 · County 027, Washington · Built 1985 · 2 Lanes · 2,119 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012862A0000000
Year Built
1985
Length
15.8 m (51.8 ft)
Max Span
15.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
2,119
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$416,000
Total Project Cost
$832,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.