US 12 over TOUCHET RIVER

12.0 E JCT US · County 071, Washington · Built 2023 · 4 Lanes · 3,740 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019406D0000000
Year Built
2023
Length
164.1 m (538.4 ft)
Max Span
55.1 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
3,740
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,974,000
Total Project Cost
$19,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.