US 12 over NINE MILE HILL ROAD

10.3 E JCT US 730 SPUR · County 071, Washington · Built 2023 · 2 Lanes · 4,070 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019406A0000000
Year Built
2023
Length
16.2 m (53.1 ft)
Max Span
16.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,070
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$510,000
Total Project Cost
$1,019,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.