S-W RAMP over I-82
0.2 E JCT US 97 · County 077, Washington · Built 2020 · 1 Lanes · 214 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.536911, -120.471772
This bridge is in worse condition than 5.6% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 6 years old.
Nearby Bridges
W-N RAMP over I-82
Built 1967
US 97 over AHTANUM CRK RR&N-N RAMP
Built 1981
MAIN ST (OLD US97) over AHTANUM CREEK
Built 1941
US 97 over AHTANUM CRK RR & ROADS
Built 1981
MAIN ST (OLD US97) over NP RY & RAMP
Built 1941
MAIN ST UNION GAP over WIDE HOLLOW CREEK
Built 1941
I-82 over WIDE HOLLOW CREEK
Built 1900
US 97 over I-82
Built 1981
FULLBRIGHT RD. over AHTANUM CREEK
Built 1986
UNION GAP SHOP RD. over WIDE HOLLOW CREEK
Built 1965
Bridge Details
- Structure #
- 0019247A0000000
- Year Built
- 2020
- Length
- 76.5 m (251 ft)
- Max Span
- 36.6 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 1
- Daily Traffic
- 214
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,669,000
- Total Project Cost
- $3,338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.