MAIN ST UNION GAP over WIDE HOLLOW CREEK
15.0 N JCT SR 22 · County 077, Washington · Built 1941 · 4 Lanes · 14,370 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.539506, -120.473661
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 85 years old.
Nearby Bridges
MAIN ST (OLD US97) over NP RY & RAMP
Built 1941
US 97 over AHTANUM CRK RR&N-N RAMP
Built 1981
MAIN ST (OLD US97) over AHTANUM CREEK
Built 1941
US 97 over AHTANUM CRK RR & ROADS
Built 1981
US 97 over I-82
Built 1981
S-W RAMP over I-82
Built 2020
W-N RAMP over I-82
Built 1967
UNION GAP SHOP RD. over WIDE HOLLOW CREEK
Built 1965
FULLBRIGHT RD. over AHTANUM CREEK
Built 1986
I-82 over WIDE HOLLOW CREEK
Built 1900
Bridge Details
- Structure #
- 0002661C0000000
- Year Built
- 1941
- Length
- 7 m (23 ft)
- Max Span
- 6.7 m
- Width
- 19.6 m (64.3 ft)
- Lanes
- 4
- Daily Traffic
- 14,370
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $372,000
- Total Project Cost
- $743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.