SR 520 over LAKE WASHINGTON

0.3 E JCT SR 513 · County 033, Washington · Built 2023 · 3 Lanes · 19,472 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.644767, -122.299211

This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
0019015B0000000
Year Built
2023
Length
1867.5 m (6127 ft)
Max Span
48.8 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
19,472
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$71,303,000
Total Project Cost
$142,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.