SR 520 over LAKE WASHINGTON

0.7 E JCT SR 513 · County 033, Washington · Built 2017 · 4 Lanes · 19,472 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.645181, -122.299294

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
0018625A0000000
Year Built
2017
Length
1819 m (5967.8 ft)
Max Span
48.8 m
Width
23.9 m (78.4 ft)
Lanes
4
Daily Traffic
19,472
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$176,052,000
Total Project Cost
$352,104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.