SR99 OFF RAMP over DETENTION VAULT
5.4 N JCT SR 509 · County 033, Washington · Built 2017 · 1 Lanes · 1,000 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
47.623142, -122.344444
This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 9 years old.
Nearby Bridges
SR 99 over SR 99 NB SR 99 NB/RAMP
Built 2015
HARRISON ST over SR 99 TUNNEL VOID SPACE
Built 2018
SR 99 over MERCER ST
Built 2015
I-5 over TERRAIN
Built 1962
I-5 over N-W RAMP E-N RAMP
Built 1967
EASTLAKE AVE over I-5 RAMPS
Built 1963
I-5 over TERRAIN
Built 1963
I-5 over DENNY WAY-LAKEVIEW V
Built 1962
DENNY WAY over I-5
Built 1962
YALE ST RAMP over I-5 REV RAMP
Built 1962
Bridge Details
- Structure #
- 0018549B0000000
- Year Built
- 2017
- Length
- 17.7 m (58.1 ft)
- Max Span
- 16.5 m
- Lanes
- 1
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $454,000
- Total Project Cost
- $909,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.