HARRISON ST over SR 99 TUNNEL VOID SPACE

6.1 N JCT SR 509 · County 033, Washington · Built 2018 · 4 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.622083, -122.344806

This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
0017999B0000000
Year Built
2018
Length
37.5 m (123 ft)
Max Span
36.9 m
Width
13.4 m (44 ft)
Lanes
4
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,344,000
Total Project Cost
$2,688,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.