SR 20 over PUGET SND @ PT TOWNSEND
12.0 E JCT US 101 · County 031, Washington · Built 2013 · 2 Lanes · 1,800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
48.111358, -122.759253
This bridge is in worse condition than 1% of bridges in County 031. The average bridge in Washington is 0 years old; this one is 13 years old.
Nearby Bridges
SR 20 over PUGET SND @ PT TOWNSEND
Built 1982
SR 20 over PUGET SND @ PT TOWNSEND
Built 1955
SR 20 over PED TRAIL
Built 1956
SR 20 EXTENSION over KEYSTONE HARBOR
Built 1979
HUNT ROAD over CHIMACUM CREEK
Built 1971
SR 116 over PORTAGE CANAL
Built 1951
SR 19 over CHIMACUM CREEK
Built 1916
SR 116 over KILISUT HARBOR
Built 2020
OLD GARDINER ROAD over CONTRACTORS CREEK
Built 2000
SR 20 over EAGLEMOUNT HALF BRIDGE
Built 1956
Bridge Details
- Structure #
- 0018254A0000000
- Year Built
- 2013
- Length
- 32.3 m (106 ft)
- Max Span
- 22.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Steel
- Design
- Movable - Lift
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $680,000
- Total Project Cost
- $1,359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.