SR 20 over PUGET SND @ PT TOWNSEND
12.9 E JCT US 101 · County 031, Washington · Built 1955 · 1 Lanes · 63 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
48.114728, -122.753894
This bridge is in worse condition than 94.8% of bridges in County 031. The average bridge in Washington is 0 years old; this one is 71 years old.
Nearby Bridges
SR 20 over PUGET SND @ PT TOWNSEND
Built 2013
SR 20 over PUGET SND @ PT TOWNSEND
Built 1982
SR 20 over PED TRAIL
Built 1956
SR 20 EXTENSION over KEYSTONE HARBOR
Built 1979
SR 116 over PORTAGE CANAL
Built 1951
HUNT ROAD over CHIMACUM CREEK
Built 1971
SR 116 over KILISUT HARBOR
Built 2020
SR 19 over CHIMACUM CREEK
Built 1916
OLD GARDINER ROAD over CONTRACTORS CREEK
Built 2000
SR 20 over EAGLEMOUNT HALF BRIDGE
Built 1956
Bridge Details
- Structure #
- 0012274B0000000
- Year Built
- 1955
- Reconstructed
- 1982
- Length
- 27.4 m (89.9 ft)
- Max Span
- 22.9 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 63
- Material
- Steel
- Design
- Movable - Lift
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $299,000
- Total Project Cost
- $598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.