SB I-5 RAMP over DETENTION VAULT

0.5 N JCT SR 524 · County 061, Washington · Built 2012 · 1 Lanes · 13,241 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0017945C0000000
Year Built
2012
Length
62.5 m (205.1 ft)
Max Span
62.5 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
13,241
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,314,000
Total Project Cost
$2,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.