SB I-5 RAMP over DETENTION VAULT

0.4 N JCT SR 524 · County 061, Washington · Built 2012 · 2 Lanes · 22,206 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
0017945B0000000
Year Built
2012
Length
82.3 m (270 ft)
Max Span
82.3 m
Width
4.7 m (15.4 ft)
Lanes
2
Daily Traffic
22,206
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,822,000
Total Project Cost
$5,643,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.