N-N RAMP over I-5
JCT SR 16 · County 053, Washington · Built 2011 · 2 Lanes · 46,602 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.2285, -122.461111
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 15 years old.
Nearby Bridges
I-5 NB HOV LANE over I-5 SB SR 16 W/NB RMPS
Built 2019
I-5 SB over SR 16 EB/SB HOV RAMPS
Built 2019
I-5 NB over SR 16 EB/SB E/S-N RAMP
Built 2017
SR 16 over FUTURE HOV LANES
Built 2014
S-S RAMP over SR 16 EB/SB I-5 RAMPS
Built 2013
SR 16 over S TACOMA WAY/STRR/CENTER
Built 2011
SR 16 over S TACOMA WAY/STRR/CENTER
Built 2013
SB I-5 TO NB SR 16 over S TACOMA WAY/STRR/CENTER
Built 2011
SR 16 HOV LANES over S TACOMA WAY
Built 2018
SR 16 HOV LANES over CENTER ST / ST RR
Built 2013
Bridge Details
- Structure #
- 0017594A0000000
- Year Built
- 2011
- Length
- 323.4 m (1061 ft)
- Max Span
- 89.9 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 46,602
- Material
- Prestressed Concrete
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,340,000
- Total Project Cost
- $22,679,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.