SR 16 HOV LANES over CENTER ST / ST RR

0.1 N JCT I-5 · County 053, Washington · Built 2013 · 2 Lanes · 40,134 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0018189E0000000
Year Built
2013
Length
211.5 m (693.9 ft)
Max Span
52.4 m
Width
17.6 m (57.7 ft)
Lanes
2
Daily Traffic
40,134
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,219,000
Total Project Cost
$20,438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.