WB I-90 RAMP over RELIEF
4.4 E JCT I-5 · County 033, Washington · Built 2007 · 1 Lanes · 434 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.58675, -122.231594
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 19 years old.
Nearby Bridges
80TH AVE over I-90
Built 1988
I-90 EB ON RAMP over RELIEF
Built 1989
ISLAND CREST WAY over I-90
Built 1989
SE 28TH ST over I-90 E-S RAMP
Built 1992
77TH AVE SE over I-90
Built 1989
CITY ST - 76TH AVE over I-90
Built 1989
SHOREWOOD DRIVE over I-90
Built 1989
72ND AVE SE over FIRST HILL LID
Built 1992
NORTH MERCER WAY over I-90
Built 1989
EB I-90 over LAKE WASHINGTON
Built 1940
Bridge Details
- Structure #
- 0017217A0000000
- Year Built
- 2007
- Length
- 57.9 m (190 ft)
- Max Span
- 26.8 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 434
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,218,000
- Total Project Cost
- $2,437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.