ISLAND CREST WAY over I-90
4.0 E JCT SR 900 · County 033, Washington · Built 1989 · 4 Lanes · 9,063 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.587047, -122.229428
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 37 years old.
Nearby Bridges
I-90 EB ON RAMP over RELIEF
Built 1989
WB I-90 RAMP over RELIEF
Built 2007
80TH AVE over I-90
Built 1988
SE 28TH ST over I-90 E-S RAMP
Built 1992
77TH AVE SE over I-90
Built 1989
CITY ST - 76TH AVE over I-90
Built 1989
SHOREWOOD DRIVE over I-90
Built 1989
72ND AVE SE over FIRST HILL LID
Built 1992
NORTH MERCER WAY over I-90
Built 1989
EAST MERCER WAY over I-90
Built 1988
Bridge Details
- Structure #
- 0013195E0000000
- Year Built
- 1989
- Length
- 78.6 m (257.9 ft)
- Max Span
- 30.8 m
- Width
- 41.5 m (136.2 ft)
- Lanes
- 4
- Daily Traffic
- 9,063
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,676,000
- Total Project Cost
- $7,353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.