HIGHLANDS DR NE over PEDESTRIAN TUNNEL

2.1 E JCT SR 900 · County 033, Washington · Built 2003 · 5 Lanes · 19,258 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0016010E0000000
Year Built
2003
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
27.4 m (89.9 ft)
Lanes
5
Daily Traffic
19,258
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$468,000
Total Project Cost
$936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.